Back to kit 6                                                                 Home                                                                           On to kit 8

Kit 7: The Boiler


August 4th 2009

I collected the boiler from the Guildford Model Engineering Show as arranged with Andy along with the smokebox and fittings for kit 8.  There are still some pieces to come and I don't as yet have any instructions.


This kit consists of the boiler with the regulator already fitted, the superheater, firebox door, blowdown valve, blower pipe and the front buffer beam and buffer assembly .


This is a picture of the pieces I have so far.



August 18th

Still waiting for the missing parts and the instructions.  In the meantime I have fitted gaskets to the regulator housing and the steam dome cap, as well as fettling the firebox door so that it will close and latch properly.  Also had to cut the bolts down as the threads in the boiler backplate were not deep enough.  Decided to go ahead and paint the backhead - just for something to do!

August 28th

Just in time for the Bank Holiday, a large box arrived from Andy containing the missing bits from kits 7 & 8, plus most of kit 9, and some of kit 10.  See the following pages for details.

All that was missing in kit 7 was the superheater with its banjo bolt fitting and the draindown valve.  

I had received the instructions from Geerlig a few days before and knew that all I had to do was fit the drain down valve, fit the superheater and put the packing in behind the regulator stuffing nut.  Fitting the drain down valve, and packing the regulator,  was the work of a few minutes each.

When the superheater and banjo bolt arrived, I did a trial fit in the boiler tube and found that the crimped end was very slightly too big.  I was going to file it down but checked with Andy first who advised that I should gently tap the sides of the crimp with a small hammer until it fitted.  The copper was still very soft from the brazing and after just a few light taps, it slid nicely into the boiler tube.







Here's a pic of the finished boiler backhead with the drain down valve fitted..  

And that's about it for kit 7.  Follow the link to kits 8, 9 and 10.





Back to kit 6                                                                 Home                                                                           On to kit 8